US Bridges

Prospect Blvd over Seco ST

Good

Los Angeles County, California · 0.4MI S/O Lincoln Blvd · Structure no. 53C0264

Built
1989
36 years old
Condition
Good
inspected July 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
402 ft
4 main spans
Daily traffic
755
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Prospect Blvd over Seco ST is a prestressed concrete continuous box beam or girders - multiple carrying Prospect Blvd over Seco ST in Los Angeles County, California. It was built in 1989, so it is 36 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 755 vehicles a day, roughly 2% of them trucks, projected to reach 831 by 2044. The structure is 402 ft (122.4 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesProspect Blvd
CrossesSeco ST
Location0.4MI S/O Lincoln Blvd
RouteCity Street 0Q304
Coordinates34.15826, -118.16181
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating80.7 US tons
Inventory rating45.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length402 ft (122.4 m)
Longest span115 ft (35.1 m)
Deck width46 ft (14.1 m)
Roadway width34 ft (10.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic755 (2018)
Projected traffic831 by 2044
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Prospect Blvd over Seco ST built?

It was built in 1989, making it 36 years old in 2025.

What condition is Prospect Blvd over Seco ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Prospect Blvd over Seco ST carry?

About 755 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is Prospect Blvd over Seco ST?

The structure is 402 ft (122.4 m) long with a longest span of 115 ft (35.1 m) and a deck 46 ft wide.

Who owns Prospect Blvd over Seco ST?

It is owned by the City or Municipal Highway Agency.