Ornge Av and Hill over Lbc Bike Path
FairLos Angeles County, California · 0.5MI S/O Willow ST · Structure no. 53C0208
- Built
- 1932
- 93 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Other
- Length
- 132 ft
- 6 main spans
- Daily traffic
- 17,663
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Ornge Av and Hill over Lbc Bike Path is a other stringer/multi-beam or girder carrying Ornge Av and Hill over Lbc Bike Path in Los Angeles County, California. It was built in 1932, so it is 93 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,663 vehicles a day, roughly 1% of them trucks, projected to reach 20,277 by 2044. The structure is 132 ft (40.2 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ornge Av and Hill over Lbc Bike Path built?
It was built in 1932, making it 93 years old in 2025.
What condition is Ornge Av and Hill over Lbc Bike Path in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Ornge Av and Hill over Lbc Bike Path carry?
About 17,663 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Ornge Av and Hill over Lbc Bike Path?
The structure is 132 ft (40.2 m) long with a longest span of 55 ft (16.8 m) and a deck 51 ft wide.
Who owns Ornge Av and Hill over Lbc Bike Path?
It is owned by the City or Municipal Highway Agency.