Gage Ave over Los Angeles Riv
PoorLos Angeles County, California · 0.1MI W/O I-710 Fwy · Structure no. 53C0159
- Built
- 1940
- 85 years old
- Condition
- Poor
- inspected December 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 476 ft
- 5 main spans
- Daily traffic
- 27,454
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Gage Ave over Los Angeles Riv is a concrete continuous tee beam carrying Gage Ave over Los Angeles Riv in Los Angeles County, California. It was built in 1940, so it is 85 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 27,454 vehicles a day, roughly 5% of them trucks, projected to reach 32,945 by 2041. The structure is 476 ft (145.1 m) long and 56 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gage Ave over Los Angeles Riv built?
It was built in 1940, making it 85 years old in 2025.
What condition is Gage Ave over Los Angeles Riv in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2023.
How much traffic does Gage Ave over Los Angeles Riv carry?
About 27,454 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Gage Ave over Los Angeles Riv?
The structure is 476 ft (145.1 m) long with a longest span of 100 ft (30.5 m) and a deck 56 ft wide.
Who owns Gage Ave over Los Angeles Riv?
It is owned by the City or Municipal Highway Agency.