Garvey Ave S over Charter Oak Wash
GoodLos Angeles County, California · 0.1MI E/O Citrus ST · Structure no. 53C0128
- Built
- 1956
- 69 years old, rebuilt 1972
- Condition
- Good
- inspected November 2021
- Type
- Slab
- Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 16,848
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Garvey Ave S over Charter Oak Wash is a concrete slab carrying Garvey Ave S over Charter Oak Wash in Los Angeles County, California. It was built in 1956 and reconstructed in 1972, so it is 69 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,848 vehicles a day, roughly 1% of them trucks, projected to reach 20,218 by 2042. The structure is 33 ft (10.1 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Garvey Ave S over Charter Oak Wash built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1972.
What condition is Garvey Ave S over Charter Oak Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.
How much traffic does Garvey Ave S over Charter Oak Wash carry?
About 16,848 vehicles per day (2014 count), of which roughly 1% are trucks.
How long is Garvey Ave S over Charter Oak Wash?
The structure is 33 ft (10.1 m) long with a longest span of 24 ft (7.3 m) and a deck 60 ft wide.
Who owns Garvey Ave S over Charter Oak Wash?
It is owned by the City or Municipal Highway Agency.