US Bridges

NB405 Offramp over Sepulveda Blvd

Good

Los Angeles County, California · 07-LA-405-32.85-LA · Structure no. 53 3090S

Built
2013
12 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
384 ft
3 main spans
Daily traffic
9,678
2021 count
Owner
State
State Highway Agency

About this bridge

NB405 Offramp over Sepulveda Blvd is a steel stringer/multi-beam or girder carrying NB405 Offramp over Sepulveda Blvd in Los Angeles County, California. It was built in 2013, so it is 12 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,678 vehicles a day, roughly 2% of them trucks, projected to reach 19,043 by 2045. The structure is 384 ft (117 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNB405 Offramp
CrossesSepulveda Blvd
Location07-LA-405-32.85-LA
RouteInterstate 405
Coordinates34.07132, -118.46484
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length384 ft (117 m)
Longest span177 ft (54 m)
Deck width51 ft (15.5 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,678 (2021)
Projected traffic19,043 by 2045
Trucks2%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB405 Offramp over Sepulveda Blvd built?

It was built in 2013, making it 12 years old in 2025.

What condition is NB405 Offramp over Sepulveda Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does NB405 Offramp over Sepulveda Blvd carry?

About 9,678 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is NB405 Offramp over Sepulveda Blvd?

The structure is 384 ft (117 m) long with a longest span of 177 ft (54 m) and a deck 51 ft wide.

Who owns NB405 Offramp over Sepulveda Blvd?

It is owned by the State Highway Agency.