US Bridges

SB 101 Onramp over Graded Earth

Good

Los Angeles County, California · 07-LA-101-9.61-LA · Structure no. 53 3087K

Built
2016
9 years old
Condition
Good
inspected March 2024
Type
Slab
Concrete Continuous
Length
181 ft
6 main spans
Daily traffic
20,000
2021 count
Owner
State
State Highway Agency

About this bridge

SB 101 Onramp over Graded Earth is a concrete continuous slab carrying SB 101 Onramp over Graded Earth in Los Angeles County, California. It was built in 2016, so it is 9 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,000 vehicles a day, roughly 5% of them trucks, projected to reach 28,660 by 2042. The structure is 181 ft (55.2 m) long and 27 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSB 101 Onramp
CrossesGraded Earth
Location07-LA-101-9.61-LA
RouteU.S. Route 101
Coordinates34.13261, -118.35189
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length181 ft (55.2 m)
Longest span38 ft (11.7 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,000 (2021)
Projected traffic28,660 by 2042
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SB 101 Onramp over Graded Earth built?

It was built in 2016, making it 9 years old in 2025.

What condition is SB 101 Onramp over Graded Earth in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SB 101 Onramp over Graded Earth carry?

About 20,000 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is SB 101 Onramp over Graded Earth?

The structure is 181 ft (55.2 m) long with a longest span of 38 ft (11.7 m) and a deck 27 ft wide.

Who owns SB 101 Onramp over Graded Earth?

It is owned by the State Highway Agency.