US Bridges

Paramount Blvd over State Route 60

Good

Los Angeles County, California · 07-LA-060-R7.80-MTBL · Structure no. 53 3076

Built
2012
13 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
250 ft
2 main spans
Daily traffic
7,000
2017 count
Owner
State
State Highway Agency

About this bridge

Paramount Blvd over State Route 60 is a prestressed concrete stringer/multi-beam or girder carrying Paramount Blvd over State Route 60 in Los Angeles County, California. It was built in 2012, so it is 13 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,000 vehicles a day, roughly 2% of them trucks, projected to reach 10,200 by 2041. The structure is 250 ft (76.2 m) long and 128 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesParamount Blvd
CrossesState Route 60
Location07-LA-060-R7.80-MTBL
RouteCity Street 0
Coordinates34.03631, -118.09328
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length250 ft (76.2 m)
Longest span123 ft (37.6 m)
Deck width128 ft (39 m)
Roadway width104 ft (31.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,000 (2017)
Projected traffic10,200 by 2041
Trucks2%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Paramount Blvd over State Route 60 built?

It was built in 2012, making it 13 years old in 2025.

What condition is Paramount Blvd over State Route 60 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Paramount Blvd over State Route 60 carry?

About 7,000 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Paramount Blvd over State Route 60?

The structure is 250 ft (76.2 m) long with a longest span of 123 ft (37.6 m) and a deck 128 ft wide.

Who owns Paramount Blvd over State Route 60?

It is owned by the State Highway Agency.