US Bridges

NB 110-9th ST Ramp over 9th ST N/B On-Ramp

Good

Los Angeles County, California · 07-LA-110-22.30-LA · Structure no. 53 3036S

Built
2012
13 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
141 ft
2 main spans
Daily traffic
16,300
2021 count
Owner
State
State Highway Agency

About this bridge

NB 110-9th ST Ramp over 9th ST N/B On-Ramp is a prestressed concrete continuous box beam or girders - multiple carrying NB 110-9th ST Ramp over 9th ST N/B On-Ramp in Los Angeles County, California. It was built in 2012, so it is 13 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,300 vehicles a day, roughly 2% of them trucks, projected to reach 17,517 by 2041. The structure is 141 ft (43 m) long and 37 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesNB 110-9th ST Ramp
Crosses9th ST N/B On-Ramp
Location07-LA-110-22.30-LA
RouteState Highway 110
Coordinates34.04778, -118.26576
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length141 ft (43 m)
Longest span71 ft (21.5 m)
Deck width37 ft (11.4 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,300 (2021)
Projected traffic17,517 by 2041
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB 110-9th ST Ramp over 9th ST N/B On-Ramp built?

It was built in 2012, making it 13 years old in 2025.

What condition is NB 110-9th ST Ramp over 9th ST N/B On-Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does NB 110-9th ST Ramp over 9th ST N/B On-Ramp carry?

About 16,300 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is NB 110-9th ST Ramp over 9th ST N/B On-Ramp?

The structure is 141 ft (43 m) long with a longest span of 71 ft (21.5 m) and a deck 37 ft wide.

Who owns NB 110-9th ST Ramp over 9th ST N/B On-Ramp?

It is owned by the State Highway Agency.