Del Amo Blvd over I 405 Dominguez Channel
GoodLos Angeles County, California · 07-LA-405-11.80-CRSN · Structure no. 53 2831
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 995 ft
- 7 main spans
- Daily traffic
- 23,460
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Del Amo Blvd over I 405 Dominguez Channel is a prestressed concrete continuous box beam or girders - multiple carrying Del Amo Blvd over I 405 Dominguez Channel in Los Angeles County, California. It was built in 2003, so it is 22 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 23,460 vehicles a day, roughly 10% of them trucks, projected to reach 26,771 by 2046. The structure is 995 ft (303.2 m) long and 87 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Del Amo Blvd over I 405 Dominguez Channel built?
It was built in 2003, making it 22 years old in 2025.
What condition is Del Amo Blvd over I 405 Dominguez Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Del Amo Blvd over I 405 Dominguez Channel carry?
About 23,460 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Del Amo Blvd over I 405 Dominguez Channel?
The structure is 995 ft (303.2 m) long with a longest span of 164 ft (50 m) and a deck 87 ft wide.
Who owns Del Amo Blvd over I 405 Dominguez Channel?
It is owned by the State Highway Agency.