N71-RIO Rancho Off over W60 - N71 Connector Ramp
GoodLos Angeles County, California · 07-LA-071-R4.05-POM · Structure no. 53 2758K
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Single or Spread
- Concrete Continuous
- Length
- 1,050 ft
- 8 main spans
- Daily traffic
- 11,100
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
N71-RIO Rancho Off over W60 - N71 Connector Ramp is a concrete continuous box beam or girders - single or spread carrying N71-RIO Rancho Off over W60 - N71 Connector Ramp in Los Angeles County, California. It was built in 1997, so it is 28 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,100 vehicles a day, roughly 5% of them trucks, projected to reach 12,400 by 2043. The structure is 1,050 ft (320 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N71-RIO Rancho Off over W60 - N71 Connector Ramp built?
It was built in 1997, making it 28 years old in 2025.
What condition is N71-RIO Rancho Off over W60 - N71 Connector Ramp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does N71-RIO Rancho Off over W60 - N71 Connector Ramp carry?
About 11,100 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is N71-RIO Rancho Off over W60 - N71 Connector Ramp?
The structure is 1,050 ft (320 m) long with a longest span of 15 ft (4.7 m) and a deck 27 ft wide.
Who owns N71-RIO Rancho Off over W60 - N71 Connector Ramp?
It is owned by the State Highway Agency.