US Bridges

E105-N&S605 Conn over San Gabriel River

Fair

Los Angeles County, California · 07-LA-105-R17.44-DNY · Structure no. 53 2698G

Built
1993
32 years old
Condition
Fair
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
388 ft
3 main spans
Daily traffic
228,000
2020 count
Owner
State
State Highway Agency

About this bridge

E105-N&S605 Conn over San Gabriel River is a prestressed concrete continuous box beam or girders - multiple carrying E105-N&S605 Conn over San Gabriel River in Los Angeles County, California. It was built in 1993, so it is 32 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 228,000 vehicles a day, roughly 9% of them trucks, projected to reach 115,981 by 2042. The structure is 388 ft (118.4 m) long and 66 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE105-N&S605 Conn
CrossesSan Gabriel River
Location07-LA-105-R17.44-DNY
RouteInterstate 105
Coordinates33.9135, -118.11164
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length388 ft (118.4 m)
Longest span151 ft (46.1 m)
Deck width66 ft (20.1 m)
Roadway width63 ft (19.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic228,000 (2020)
Projected traffic115,981 by 2042
Trucks9%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusEligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E105-N&S605 Conn over San Gabriel River built?

It was built in 1993, making it 32 years old in 2025.

What condition is E105-N&S605 Conn over San Gabriel River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does E105-N&S605 Conn over San Gabriel River carry?

About 228,000 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is E105-N&S605 Conn over San Gabriel River?

The structure is 388 ft (118.4 m) long with a longest span of 151 ft (46.1 m) and a deck 66 ft wide.

Who owns E105-N&S605 Conn over San Gabriel River?

It is owned by the State Highway Agency.