N&S110-E105 Conn over UP RR 117th ST Broadway
GoodLos Angeles County, California · 07-LA-110-13.70-LA · Structure no. 53 2408H
- Built
- 1991
- 34 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 994 ft
- 9 main spans
- Daily traffic
- 27,600
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
N&S110-E105 Conn over UP RR 117th ST Broadway is a prestressed concrete continuous box beam or girders - multiple carrying N&S110-E105 Conn over UP RR 117th ST Broadway in Los Angeles County, California. It was built in 1991, so it is 34 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 27,600 vehicles a day, roughly 2% of them trucks, projected to reach 31,640 by 2042. The structure is 994 ft (303 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N&S110-E105 Conn over UP RR 117th ST Broadway built?
It was built in 1991, making it 34 years old in 2025.
What condition is N&S110-E105 Conn over UP RR 117th ST Broadway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does N&S110-E105 Conn over UP RR 117th ST Broadway carry?
About 27,600 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is N&S110-E105 Conn over UP RR 117th ST Broadway?
The structure is 994 ft (303 m) long with a longest span of 141 ft (43 m) and a deck 38 ft wide.
Who owns N&S110-E105 Conn over UP RR 117th ST Broadway?
It is owned by the State Highway Agency.