E210-ROSEMEAD Off over Sierra Madre & E210 Onrp
GoodLos Angeles County, California · 07-LA-210-R29.35-PAS · Structure no. 53 2398S
- Built
- 1976
- 49 years old
- Condition
- Good
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 434 ft
- 4 main spans
- Daily traffic
- 5,200
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
E210-ROSEMEAD Off over Sierra Madre & E210 Onrp is a prestressed concrete continuous box beam or girders - multiple carrying E210-ROSEMEAD Off over Sierra Madre & E210 Onrp in Los Angeles County, California. It was built in 1976, so it is 49 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,200 vehicles a day, roughly 3% of them trucks, projected to reach 5,667 by 2042. The structure is 434 ft (132.4 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E210-ROSEMEAD Off over Sierra Madre & E210 Onrp built?
It was built in 1976, making it 49 years old in 2025.
What condition is E210-ROSEMEAD Off over Sierra Madre & E210 Onrp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does E210-ROSEMEAD Off over Sierra Madre & E210 Onrp carry?
About 5,200 vehicles per day (2015 count), of which roughly 3% are trucks.
How long is E210-ROSEMEAD Off over Sierra Madre & E210 Onrp?
The structure is 434 ft (132.4 m) long with a longest span of 122 ft (37.2 m) and a deck 26 ft wide.
Who owns E210-ROSEMEAD Off over Sierra Madre & E210 Onrp?
It is owned by the State Highway Agency.