W118-S5 Connector over Routes 5 & 118 Laurel Cy
FairLos Angeles County, California · 07-LA-118-R11.52L-LA · Structure no. 53 2327F
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 1,672 ft
- 5 main spans
- Daily traffic
- 11,692
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
W118-S5 Connector over Routes 5 & 118 Laurel Cy is a prestressed concrete continuous box beam or girders - multiple carrying W118-S5 Connector over Routes 5 & 118 Laurel Cy in Los Angeles County, California. It was built in 1976, so it is 49 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,692 vehicles a day, roughly 3% of them trucks, projected to reach 15,269 by 2046. The structure is 1,672 ft (509.6 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W118-S5 Connector over Routes 5 & 118 Laurel Cy built?
It was built in 1976, making it 49 years old in 2025.
What condition is W118-S5 Connector over Routes 5 & 118 Laurel Cy in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does W118-S5 Connector over Routes 5 & 118 Laurel Cy carry?
About 11,692 vehicles per day (2018 count), of which roughly 3% are trucks.
How long is W118-S5 Connector over Routes 5 & 118 Laurel Cy?
The structure is 1,672 ft (509.6 m) long with a longest span of 176 ft (53.6 m) and a deck 42 ft wide.
Who owns W118-S5 Connector over Routes 5 & 118 Laurel Cy?
It is owned by the State Highway Agency.