Route 2 EB over RTE 210 Verdugo Bl Con

Good

Los Angeles County, California · 07-LA-002-R22.97-GNDL · Structure no. 53 2231R

Built
1972
53 years old
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
1,132 ft
9 main spans
Daily traffic
57,500
2014 count
Owner
State
State Highway Agency

About this bridge

Route 2 EB over RTE 210 Verdugo Bl Con is a concrete continuous box beam or girders - multiple carrying Route 2 EB over RTE 210 Verdugo Bl Con in Los Angeles County, California. It was built in 1972, so it is 53 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 57,500 vehicles a day, roughly 5% of them trucks, projected to reach 62,884 by 2044. The structure is 1,132 ft (345 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRoute 2 EB
CrossesRTE 210 Verdugo Bl Con
Location07-LA-002-R22.97-GNDL
RouteState Highway 2
Coordinates34.20514, -118.21813
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.7 US tons
Inventory rating54.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans9
Design loadHS 20
Structure length1,132 ft (345 m)
Longest span155 ft (47.2 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic57,500 (2014)
Projected traffic62,884 by 2044
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 2 EB over RTE 210 Verdugo Bl Con built?

It was built in 1972, making it 53 years old in 2025.

What condition is Route 2 EB over RTE 210 Verdugo Bl Con in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Route 2 EB over RTE 210 Verdugo Bl Con carry?

About 57,500 vehicles per day (2014 count), of which roughly 5% are trucks.

How long is Route 2 EB over RTE 210 Verdugo Bl Con?

The structure is 1,132 ft (345 m) long with a longest span of 155 ft (47.2 m) and a deck 34 ft wide.

Who owns Route 2 EB over RTE 210 Verdugo Bl Con?

It is owned by the State Highway Agency.