E&W118-S405 Connec over S405-DEVONSHIRE ST Offrp
GoodLos Angeles County, California · 07-LA-118-R9.74-LA · Structure no. 53 2217H
- Built
- 1977
- 48 years old
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 113 ft
- 1 main span
- Daily traffic
- 44,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
E&W118-S405 Connec over S405-DEVONSHIRE ST Offrp is a concrete box beam or girders - multiple carrying E&W118-S405 Connec over S405-DEVONSHIRE ST Offrp in Los Angeles County, California. It was built in 1977, so it is 48 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 44,500 vehicles a day, roughly 2% of them trucks, projected to reach 56,512 by 2046. The structure is 113 ft (34.4 m) long and 71 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E&W118-S405 Connec over S405-DEVONSHIRE ST Offrp built?
It was built in 1977, making it 48 years old in 2025.
What condition is E&W118-S405 Connec over S405-DEVONSHIRE ST Offrp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does E&W118-S405 Connec over S405-DEVONSHIRE ST Offrp carry?
About 44,500 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is E&W118-S405 Connec over S405-DEVONSHIRE ST Offrp?
The structure is 113 ft (34.4 m) long with a longest span of 112 ft (34.1 m) and a deck 71 ft wide.
Who owns E&W118-S405 Connec over S405-DEVONSHIRE ST Offrp?
It is owned by the State Highway Agency.