E134-FIGUEROA Off over Figueroa Street
FairLos Angeles County, California · 07-LA-134-R11.44-LA · Structure no. 53 2151S
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 182 ft
- 3 main spans
- Daily traffic
- 7,651
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
E134-FIGUEROA Off over Figueroa Street is a concrete continuous box beam or girders - multiple carrying E134-FIGUEROA Off over Figueroa Street in Los Angeles County, California. It was built in 1971, so it is 54 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,651 vehicles a day, roughly 2% of them trucks, projected to reach 8,292 by 2046. The structure is 182 ft (55.5 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E134-FIGUEROA Off over Figueroa Street built?
It was built in 1971, making it 54 years old in 2025.
What condition is E134-FIGUEROA Off over Figueroa Street in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does E134-FIGUEROA Off over Figueroa Street carry?
About 7,651 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is E134-FIGUEROA Off over Figueroa Street?
The structure is 182 ft (55.5 m) long with a longest span of 99 ft (30.1 m) and a deck 26 ft wide.
Who owns E134-FIGUEROA Off over Figueroa Street?
It is owned by the State Highway Agency.