W210-FOOTHILL Off over Michillinda Ave & Onramp
FairLos Angeles County, California · 07-LA-210-R29.81-ADA · Structure no. 53 2020K
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 386 ft
- 4 main spans
- Daily traffic
- 7,500
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
W210-FOOTHILL Off over Michillinda Ave & Onramp is a concrete continuous box beam or girders - multiple carrying W210-FOOTHILL Off over Michillinda Ave & Onramp in Los Angeles County, California. It was built in 1971, so it is 54 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,500 vehicles a day, roughly 2% of them trucks, projected to reach 12,800 by 2042. The structure is 386 ft (117.7 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W210-FOOTHILL Off over Michillinda Ave & Onramp built?
It was built in 1971, making it 54 years old in 2025.
What condition is W210-FOOTHILL Off over Michillinda Ave & Onramp in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does W210-FOOTHILL Off over Michillinda Ave & Onramp carry?
About 7,500 vehicles per day (2015 count), of which roughly 2% are trucks.
How long is W210-FOOTHILL Off over Michillinda Ave & Onramp?
The structure is 386 ft (117.7 m) long with a longest span of 110 ft (33.5 m) and a deck 38 ft wide.
Who owns W210-FOOTHILL Off over Michillinda Ave & Onramp?
It is owned by the State Highway Agency.