US Bridges

Interstate 210 EB over Rosemead Blvd

Good

Los Angeles County, California · 07-LA-210-R29.49-PAS · Structure no. 53 1957R

Built
1971
54 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
147,000
2015 count
Owner
State
State Highway Agency

About this bridge

Interstate 210 EB over Rosemead Blvd is a prestressed concrete stringer/multi-beam or girder carrying Interstate 210 EB over Rosemead Blvd in Los Angeles County, California. It was built in 1971, so it is 54 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 147,000 vehicles a day, roughly 5% of them trucks, projected to reach 144,910 by 2042. The structure is 100 ft (30.5 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesInterstate 210 EB
CrossesRosemead Blvd
Location07-LA-210-R29.49-PAS
RouteInterstate 210
Coordinates34.14805, -118.07356
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.5 US tons
Inventory rating21.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length100 ft (30.5 m)
Longest span97 ft (29.6 m)
Deck width82 ft (25 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic147,000 (2015)
Projected traffic144,910 by 2042
Trucks5%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 210 EB over Rosemead Blvd built?

It was built in 1971, making it 54 years old in 2025.

What condition is Interstate 210 EB over Rosemead Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Interstate 210 EB over Rosemead Blvd carry?

About 147,000 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Interstate 210 EB over Rosemead Blvd?

The structure is 100 ft (30.5 m) long with a longest span of 97 ft (29.6 m) and a deck 82 ft wide.

Who owns Interstate 210 EB over Rosemead Blvd?

It is owned by the State Highway Agency.