N405-W90 Connector over E90-N405 Conn I 405 Rmps
FairLos Angeles County, California · 07-LA-405-25.99-CLC · Structure no. 53 1838G
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 944 ft
- 2 main spans
- Daily traffic
- 19,302
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
N405-W90 Connector over E90-N405 Conn I 405 Rmps is a prestressed concrete continuous stringer/multi-beam or girder carrying N405-W90 Connector over E90-N405 Conn I 405 Rmps in Los Angeles County, California. It was built in 1967, so it is 58 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,302 vehicles a day, roughly 2% of them trucks, projected to reach 22,282 by 2045. The structure is 944 ft (287.7 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N405-W90 Connector over E90-N405 Conn I 405 Rmps built?
It was built in 1967, making it 58 years old in 2025.
What condition is N405-W90 Connector over E90-N405 Conn I 405 Rmps in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does N405-W90 Connector over E90-N405 Conn I 405 Rmps carry?
About 19,302 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is N405-W90 Connector over E90-N405 Conn I 405 Rmps?
The structure is 944 ft (287.7 m) long with a longest span of 110 ft (33.5 m) and a deck 40 ft wide.
Who owns N405-W90 Connector over E90-N405 Conn I 405 Rmps?
It is owned by the State Highway Agency.