W138-S5 & N5-E138 over Quail Lake Road
GoodLos Angeles County, California · 07-LA-138-0.24L · Structure no. 53 1801E
- Built
- 1967
- 58 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 156 ft
- 2 main spans
- Daily traffic
- 4,450
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
W138-S5 & N5-E138 over Quail Lake Road is a concrete continuous box beam or girders - multiple carrying W138-S5 & N5-E138 over Quail Lake Road in Los Angeles County, California. It was built in 1967, so it is 58 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,450 vehicles a day, roughly 2% of them trucks, projected to reach 6,642 by 2041. The structure is 156 ft (47.5 m) long and 92 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W138-S5 & N5-E138 over Quail Lake Road built?
It was built in 1967, making it 58 years old in 2025.
What condition is W138-S5 & N5-E138 over Quail Lake Road in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does W138-S5 & N5-E138 over Quail Lake Road carry?
About 4,450 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is W138-S5 & N5-E138 over Quail Lake Road?
The structure is 156 ft (47.5 m) long with a longest span of 76 ft (23.2 m) and a deck 92 ft wide.
Who owns W138-S5 & N5-E138 over Quail Lake Road?
It is owned by the State Highway Agency.