US Bridges

State Route 60 over Seventh Ave

Good

Los Angeles County, California · 07-LA-060-14.26 · Structure no. 53 1771

Built
1967
58 years old, rebuilt 2014
Condition
Good
inspected August 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
208 ft
3 main spans
Daily traffic
263,000
2017 count
Owner
State
State Highway Agency

About this bridge

State Route 60 over Seventh Ave is a concrete continuous box beam or girders - multiple carrying State Route 60 over Seventh Ave in Los Angeles County, California. It was built in 1967 and reconstructed in 2014, so it is 58 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 263,000 vehicles a day, roughly 10% of them trucks, projected to reach 294,080 by 2046. The structure is 208 ft (63.4 m) long and 180 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesState Route 60
CrossesSeventh Ave
Location07-LA-060-14.26
RouteState Highway 60
Coordinates34.01945, -117.98851
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88.2 US tons
Inventory rating53.2 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length208 ft (63.4 m)
Longest span115 ft (35.1 m)
Deck width180 ft (54.9 m)
Roadway width171 ft (52.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic263,000 (2017)
Projected traffic294,080 by 2046
Trucks10%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was State Route 60 over Seventh Ave built?

It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2014.

What condition is State Route 60 over Seventh Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does State Route 60 over Seventh Ave carry?

About 263,000 vehicles per day (2017 count), of which roughly 10% are trucks.

How long is State Route 60 over Seventh Ave?

The structure is 208 ft (63.4 m) long with a longest span of 115 ft (35.1 m) and a deck 180 ft wide.

Who owns State Route 60 over Seventh Ave?

It is owned by the State Highway Agency.