US Bridges

State Route 60 over Findlay Ave

Good

Los Angeles County, California · 07-LA-060-R5.16-MTBL · Structure no. 53 1693

Built
1967
58 years old, rebuilt 2004
Condition
Good
inspected May 2023
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
127 ft
3 main spans
Daily traffic
250,000
2019 count
Owner
State
State Highway Agency

About this bridge

State Route 60 over Findlay Ave is a concrete continuous box beam or girders - multiple carrying State Route 60 over Findlay Ave in Los Angeles County, California. It was built in 1967 and reconstructed in 2004, so it is 58 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 250,000 vehicles a day, roughly 7% of them trucks, projected to reach 269,337 by 2040. The structure is 127 ft (38.7 m) long and 151 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesState Route 60
CrossesFindlay Ave
Location07-LA-060-R5.16-MTBL
RouteState Highway 60
Coordinates34.03287, -118.13816
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38.9 US tons
Inventory rating30 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length127 ft (38.7 m)
Longest span63 ft (19.2 m)
Deck width151 ft (46.1 m)
Roadway width148 ft (45.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250,000 (2019)
Projected traffic269,337 by 2040
Trucks7%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was State Route 60 over Findlay Ave built?

It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2004.

What condition is State Route 60 over Findlay Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does State Route 60 over Findlay Ave carry?

About 250,000 vehicles per day (2019 count), of which roughly 7% are trucks.

How long is State Route 60 over Findlay Ave?

The structure is 127 ft (38.7 m) long with a longest span of 63 ft (19.2 m) and a deck 151 ft wide.

Who owns State Route 60 over Findlay Ave?

It is owned by the State Highway Agency.