US Bridges

Route 5 over Burbank West Channel

Good

Los Angeles County, California · 07-LA-005-30.00-BRB · Structure no. 53 1673M

Built
1960
65 years old
Condition
Good
inspected December 2024
Type
Culvert
Concrete
Length
148 ft
1 main span
Daily traffic
239,016
2018 count
Owner
State
State Highway Agency

About this bridge

Route 5 over Burbank West Channel is a concrete culvert carrying Route 5 over Burbank West Channel in Los Angeles County, California. It was built in 1960, so it is 65 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 239,016 vehicles a day, roughly 8% of them trucks, projected to reach 244,065 by 2046. The structure is 148 ft (45.1 m) long and 148 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoute 5
CrossesBurbank West Channel
Location07-LA-005-30.00-BRB
RouteInterstate 5
Coordinates34.18756, -118.32149
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length148 ft (45.1 m)
Longest span140 ft (42.7 m)
Deck width148 ft (45.1 m)
Roadway width147 ft (44.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic239,016 (2018)
Projected traffic244,065 by 2046
Trucks8%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Route 5 over Burbank West Channel built?

It was built in 1960, making it 65 years old in 2025.

What condition is Route 5 over Burbank West Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Route 5 over Burbank West Channel carry?

About 239,016 vehicles per day (2018 count), of which roughly 8% are trucks.

How long is Route 5 over Burbank West Channel?

The structure is 148 ft (45.1 m) long with a longest span of 140 ft (42.7 m) and a deck 148 ft wide.

Who owns Route 5 over Burbank West Channel?

It is owned by the State Highway Agency.