US Bridges

Euclid Ave Off-Ram over SB Interstate 5

Fair

Los Angeles County, California · 07-LA-005-16.14-LA · Structure no. 53 1389L

Built
1960
65 years old, rebuilt 2008
Condition
Fair
inspected January 2025
Type
Slab
Concrete
Length
59 ft
1 main span
Daily traffic
129,000
2019 count
Owner
State
State Highway Agency

About this bridge

Euclid Ave Off-Ram over SB Interstate 5 is a concrete slab carrying Euclid Ave Off-Ram over SB Interstate 5 in Los Angeles County, California. It was built in 1960 and reconstructed in 2008, so it is 65 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 129,000 vehicles a day, roughly 7% of them trucks, projected to reach 135,143 by 2045. The structure is 59 ft (18 m) long and 75 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEuclid Ave Off-Ram
CrossesSB Interstate 5
Location07-LA-005-16.14-LA
RouteInterstate 5
Coordinates34.02781, -118.21215
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110 US tons
Inventory rating78.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length59 ft (18 m)
Longest span53 ft (16.2 m)
Deck width75 ft (23 m)
Roadway width58 ft (17.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic129,000 (2019)
Projected traffic135,143 by 2045
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Euclid Ave Off-Ram over SB Interstate 5 built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 2008.

What condition is Euclid Ave Off-Ram over SB Interstate 5 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Euclid Ave Off-Ram over SB Interstate 5 carry?

About 129,000 vehicles per day (2019 count), of which roughly 7% are trucks.

How long is Euclid Ave Off-Ram over SB Interstate 5?

The structure is 59 ft (18 m) long with a longest span of 53 ft (16.2 m) and a deck 75 ft wide.

Who owns Euclid Ave Off-Ram over SB Interstate 5?

It is owned by the State Highway Agency.