US Bridges

Interstate 10 over Glendora Storm Drain

Good

Los Angeles County, California · 07-LA-010-35.81-WCOV · Structure no. 53 1352M

Built
1956
69 years old, rebuilt 1975
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
29 ft
4 main spans
Daily traffic
215,000
2014 count
Owner
State
State Highway Agency

About this bridge

Interstate 10 over Glendora Storm Drain is a concrete culvert carrying Interstate 10 over Glendora Storm Drain in Los Angeles County, California. It was built in 1956 and reconstructed in 1975, so it is 69 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 215,000 vehicles a day, roughly 10% of them trucks, projected to reach 286,467 by 2041. The structure is 29 ft (8.8 m) long and 156 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesInterstate 10
CrossesGlendora Storm Drain
Location07-LA-010-35.81-WCOV
RouteInterstate 10
Coordinates34.07209, -117.91996
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadUnknown
Structure length29 ft (8.8 m)
Longest span5 ft (1.5 m)
Deck width156 ft (47.5 m)
Roadway width152 ft (46.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic215,000 (2014)
Projected traffic286,467 by 2041
Trucks10%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 10 over Glendora Storm Drain built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1975.

What condition is Interstate 10 over Glendora Storm Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Interstate 10 over Glendora Storm Drain carry?

About 215,000 vehicles per day (2014 count), of which roughly 10% are trucks.

How long is Interstate 10 over Glendora Storm Drain?

The structure is 29 ft (8.8 m) long with a longest span of 5 ft (1.5 m) and a deck 156 ft wide.

Who owns Interstate 10 over Glendora Storm Drain?

It is owned by the State Highway Agency.