US Bridges

State Route 134 over Vineland Avenue

Fair

Los Angeles County, California · 07-LA-134-0.35-LA · Structure no. 53 1272

Built
1962
63 years old, rebuilt 2004
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
188 ft
2 main spans
Daily traffic
190,000
2017 count
Owner
State
State Highway Agency

About this bridge

State Route 134 over Vineland Avenue is a concrete continuous box beam or girders - multiple carrying State Route 134 over Vineland Avenue in Los Angeles County, California. It was built in 1962 and reconstructed in 2004, so it is 63 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 190,000 vehicles a day, roughly 4% of them trucks, projected to reach 280,093 by 2040. The structure is 188 ft (57.3 m) long and 165 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesState Route 134
CrossesVineland Avenue
Location07-LA-134-0.35-LA
RouteState Highway 134
Coordinates34.15276, -118.37065
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.4 US tons
Inventory rating39.2 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHS 20
Structure length188 ft (57.3 m)
Longest span61 ft (18.7 m)
Deck width165 ft (50.3 m)
Roadway width156 ft (47.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic190,000 (2017)
Projected traffic280,093 by 2040
Trucks4%
Lanes on structure11
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was State Route 134 over Vineland Avenue built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2004.

What condition is State Route 134 over Vineland Avenue in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does State Route 134 over Vineland Avenue carry?

About 190,000 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is State Route 134 over Vineland Avenue?

The structure is 188 ft (57.3 m) long with a longest span of 61 ft (18.7 m) and a deck 165 ft wide.

Who owns State Route 134 over Vineland Avenue?

It is owned by the State Highway Agency.