105-EL Segundo Bl over El Segundo Blvd
GoodLos Angeles County, California · 07-LA-405-20.24-HAW · Structure no. 53 1239J
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 164 ft
- 1 main span
- Daily traffic
- 5,950
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
105-EL Segundo Bl over El Segundo Blvd is a prestressed concrete box beam or girders - multiple carrying 105-EL Segundo Bl over El Segundo Blvd in Los Angeles County, California. It was built in 1989, so it is 36 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,950 vehicles a day, roughly 2% of them trucks, projected to reach 4,234 by 2041. The structure is 164 ft (50 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 105-EL Segundo Bl over El Segundo Blvd built?
It was built in 1989, making it 36 years old in 2025.
What condition is 105-EL Segundo Bl over El Segundo Blvd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does 105-EL Segundo Bl over El Segundo Blvd carry?
About 5,950 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is 105-EL Segundo Bl over El Segundo Blvd?
The structure is 164 ft (50 m) long with a longest span of 161 ft (49.1 m) and a deck 35 ft wide.
Who owns 105-EL Segundo Bl over El Segundo Blvd?
It is owned by the State Highway Agency.