Interstate 5 NB over Metrolink UP RR AMTRAK
FairLos Angeles County, California · 07-LA-005-28.70-BRB · Structure no. 53 1085R
- Built
- 1959
- 66 years old, rebuilt 2020
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 740 ft
- 8 main spans
- Daily traffic
- 119,510
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
Interstate 5 NB over Metrolink UP RR AMTRAK is a steel stringer/multi-beam or girder carrying Interstate 5 NB over Metrolink UP RR AMTRAK in Los Angeles County, California. It was built in 1959 and reconstructed in 2020, so it is 66 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 119,510 vehicles a day, roughly 8% of them trucks, projected to reach 119,620 by 2041. The structure is 740 ft (225.6 m) long and 98 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Interstate 5 NB over Metrolink UP RR AMTRAK built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 2020.
What condition is Interstate 5 NB over Metrolink UP RR AMTRAK in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Interstate 5 NB over Metrolink UP RR AMTRAK carry?
About 119,510 vehicles per day (2018 count), of which roughly 8% are trucks.
How long is Interstate 5 NB over Metrolink UP RR AMTRAK?
The structure is 740 ft (225.6 m) long with a longest span of 110 ft (33.4 m) and a deck 98 ft wide.
Who owns Interstate 5 NB over Metrolink UP RR AMTRAK?
It is owned by the State Highway Agency.