US Bridges

State Route 2 over Delay Drive Oh

Good

Los Angeles County, California · 07-LA-002-16.12-LA · Structure no. 53 1040

Built
1958
67 years old, rebuilt 1976
Condition
Good
inspected March 2025
Type
Slab
Concrete Continuous
Length
99 ft
2 main spans
Daily traffic
153,000
2019 count
Owner
State
State Highway Agency

About this bridge

State Route 2 over Delay Drive Oh is a concrete continuous slab carrying State Route 2 over Delay Drive Oh in Los Angeles County, California. It was built in 1958 and reconstructed in 1976, so it is 67 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 153,000 vehicles a day, roughly 5% of them trucks, projected to reach 206,221 by 2047. The structure is 99 ft (30.2 m) long and 192 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesState Route 2
CrossesDelay Drive Oh
Location07-LA-002-16.12-LA
RouteState Highway 2
Coordinates34.11374, -118.24294
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating101.1 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length99 ft (30.2 m)
Longest span51 ft (15.5 m)
Deck width192 ft (58.5 m)
Roadway width186 ft (56.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic153,000 (2019)
Projected traffic206,221 by 2047
Trucks5%
Lanes on structure11
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was State Route 2 over Delay Drive Oh built?

It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1976.

What condition is State Route 2 over Delay Drive Oh in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2025.

How much traffic does State Route 2 over Delay Drive Oh carry?

About 153,000 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is State Route 2 over Delay Drive Oh?

The structure is 99 ft (30.2 m) long with a longest span of 51 ft (15.5 m) and a deck 192 ft wide.

Who owns State Route 2 over Delay Drive Oh?

It is owned by the State Highway Agency.