N110-MARMION Way over Arroyo Seco & Bike Path
GoodLos Angeles County, California · 07-LA-110-29.20-LA · Structure no. 53 0886S
- Built
- 1940
- 85 years old
- Condition
- Good
- inspected January 2025
- Type
- Tee Beam
- Concrete
- Length
- 81 ft
- 1 main span
- Daily traffic
- 8,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
N110-MARMION Way over Arroyo Seco & Bike Path is a concrete tee beam carrying N110-MARMION Way over Arroyo Seco & Bike Path in Los Angeles County, California. It was built in 1940, so it is 85 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,500 vehicles a day, roughly 2% of them trucks, projected to reach 10,304 by 2047. The structure is 81 ft (24.7 m) long and 32 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N110-MARMION Way over Arroyo Seco & Bike Path built?
It was built in 1940, making it 85 years old in 2025.
What condition is N110-MARMION Way over Arroyo Seco & Bike Path in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does N110-MARMION Way over Arroyo Seco & Bike Path carry?
About 8,500 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is N110-MARMION Way over Arroyo Seco & Bike Path?
The structure is 81 ft (24.7 m) long with a longest span of 79 ft (24.1 m) and a deck 32 ft wide.
Who owns N110-MARMION Way over Arroyo Seco & Bike Path?
It is owned by the State Highway Agency.