US Bridges

S110-E&W10 Conn over Venice Bl Pico Bl 12th

Good

Los Angeles County, California · 07-LA-110-21.71-LA · Structure no. 53 0707F

Built
1962
63 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
2,252 ft
30 main spans
Daily traffic
55,000
2022 count
Owner
State
State Highway Agency

About this bridge

S110-E&W10 Conn over Venice Bl Pico Bl 12th is a prestressed concrete stringer/multi-beam or girder carrying S110-E&W10 Conn over Venice Bl Pico Bl 12th in Los Angeles County, California. It was built in 1962, so it is 63 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 55,000 vehicles a day, roughly 2% of them trucks, projected to reach 58,670 by 2042. The structure is 2,252 ft (686.4 m) long and 34 ft wide.

CarriesS110-E&W10 Conn
CrossesVenice Bl Pico Bl 12th
Location07-LA-110-21.71-LA
RouteState Highway 110
Coordinates34.03899, -118.27481
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating63.9 US tons
Inventory rating38.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans30
Design loadHS 20
Structure length2,252 ft (686.4 m)
Longest span91 ft (27.7 m)
Deck width34 ft (10.5 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic55,000 (2022)
Projected traffic58,670 by 2042
Trucks2%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S110-E&W10 Conn over Venice Bl Pico Bl 12th built?

It was built in 1962, making it 63 years old in 2025.

What condition is S110-E&W10 Conn over Venice Bl Pico Bl 12th in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does S110-E&W10 Conn over Venice Bl Pico Bl 12th carry?

About 55,000 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is S110-E&W10 Conn over Venice Bl Pico Bl 12th?

The structure is 2,252 ft (686.4 m) long with a longest span of 91 ft (27.7 m) and a deck 34 ft wide.

Who owns S110-E&W10 Conn over Venice Bl Pico Bl 12th?

It is owned by the State Highway Agency.