US Bridges

Dover Ave over Future Ca Highspeed Rail

Good

Kings County, California · East of S 8th Ave · Structure no. 45C0146

Built
2022
3 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
227 ft
3 main spans
Daily traffic
1,000
2022 count
Owner
State
Other State Agency

About this bridge

Dover Ave over Future Ca Highspeed Rail is a prestressed concrete continuous stringer/multi-beam or girder carrying Dover Ave over Future Ca Highspeed Rail in Kings County, California. It was built in 2022, so it is 3 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 5% of them trucks, projected to reach 1,300 by 2042. The structure is 227 ft (69.2 m) long and 43 ft wide.

CarriesDover Ave
CrossesFuture Ca Highspeed Rail
LocationEast of S 8th Ave
RouteCounty Highway 0
Coordinates36.41578, -119.60002
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadGreater than HL 93
Structure length227 ft (69.2 m)
Longest span95 ft (29 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2022)
Projected traffic1,300 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther State Agency
Maintained byOther State Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Dover Ave over Future Ca Highspeed Rail built?

It was built in 2022, making it 3 years old in 2025.

What condition is Dover Ave over Future Ca Highspeed Rail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Dover Ave over Future Ca Highspeed Rail carry?

About 1,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Dover Ave over Future Ca Highspeed Rail?

The structure is 227 ft (69.2 m) long with a longest span of 95 ft (29 m) and a deck 43 ft wide.

Who owns Dover Ave over Future Ca Highspeed Rail?

It is owned by the Other State Agency.