US Bridges

170th Street West over Dwp Pipeline

Fair

Kern County, California · 0.3 MI N of Rosamond Blvd · Structure no. 50C0390

Built
2012
13 years old
Condition
Fair
inspected November 2023
Type
Slab
Concrete
Length
72 ft
1 main span
Daily traffic
300
2012 count
Owner
County
County Highway Agency

About this bridge

170th Street West over Dwp Pipeline is a concrete slab carrying 170th Street West over Dwp Pipeline in Kern County, California. It was built in 2012, so it is 13 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 300 vehicles a day, roughly 1% of them trucks, projected to reach 524 by 2045. The structure is 72 ft (21.8 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

Carries170th Street West
CrossesDwp Pipeline
Location0.3 MI N of Rosamond Blvd
RouteCity Street 0
Coordinates34.86769, -118.43221
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length72 ft (21.8 m)
Longest span64 ft (19.5 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2012)
Projected traffic524 by 2045
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 170th Street West over Dwp Pipeline built?

It was built in 2012, making it 13 years old in 2025.

What condition is 170th Street West over Dwp Pipeline in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does 170th Street West over Dwp Pipeline carry?

About 300 vehicles per day (2012 count), of which roughly 1% are trucks.

How long is 170th Street West over Dwp Pipeline?

The structure is 72 ft (21.8 m) long with a longest span of 64 ft (19.5 m) and a deck 43 ft wide.

Who owns 170th Street West over Dwp Pipeline?

It is owned by the County Highway Agency.