US Bridges

Mil Potrero HWY over San Emigdio Creek

Good

Kern County, California · At Woodland Dr. · Structure no. 50C0175

Built
1968
57 years old
Condition
Good
inspected November 2023
Type
Culvert
Steel
Length
44 ft
2 main spans
Daily traffic
2,200
2007 count
Owner
County
County Highway Agency

About this bridge

Mil Potrero HWY over San Emigdio Creek is a steel culvert carrying Mil Potrero HWY over San Emigdio Creek in Kern County, California. It was built in 1968, so it is 57 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,200 vehicles a day, roughly 3% of them trucks, projected to reach 2,681 by 2041. The structure is 44 ft (13.4 m) long. If it were closed, the detour would be 12.4 mi (20 km).

CarriesMil Potrero HWY
CrossesSan Emigdio Creek
LocationAt Woodland Dr.
RouteCounty Highway 0
Coordinates34.85269, -119.16013
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans2
Design loadUnknown
Structure length44 ft (13.4 m)
Longest span19 ft (5.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,200 (2007)
Projected traffic2,681 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mil Potrero HWY over San Emigdio Creek built?

It was built in 1968, making it 57 years old in 2025.

What condition is Mil Potrero HWY over San Emigdio Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Mil Potrero HWY over San Emigdio Creek carry?

About 2,200 vehicles per day (2007 count), of which roughly 3% are trucks.

How long is Mil Potrero HWY over San Emigdio Creek?

The structure is 44 ft (13.4 m) long with a longest span of 19 ft (5.8 m).

Who owns Mil Potrero HWY over San Emigdio Creek?

It is owned by the County Highway Agency.