N99-AIRPORT DR Off over Buck Owen Calloway Cnl
GoodKern County, California · 06-KER-099-26.70 · Structure no. 50 0265S
- Built
- 1963
- 62 years old, rebuilt 1998
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 309 ft
- 6 main spans
- Daily traffic
- 14,300
- 2011 count
- Owner
- State
- State Highway Agency
About this bridge
N99-AIRPORT DR Off over Buck Owen Calloway Cnl is a concrete continuous box beam or girders - multiple carrying N99-AIRPORT DR Off over Buck Owen Calloway Cnl in Kern County, California. It was built in 1963 and reconstructed in 1998, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,300 vehicles a day, roughly 2% of them trucks, projected to reach 20,403 by 2045. The structure is 309 ft (94.1 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N99-AIRPORT DR Off over Buck Owen Calloway Cnl built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1998.
What condition is N99-AIRPORT DR Off over Buck Owen Calloway Cnl in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does N99-AIRPORT DR Off over Buck Owen Calloway Cnl carry?
About 14,300 vehicles per day (2011 count), of which roughly 2% are trucks.
How long is N99-AIRPORT DR Off over Buck Owen Calloway Cnl?
The structure is 309 ft (94.1 m) long with a longest span of 62 ft (18.9 m) and a deck 40 ft wide.
Who owns N99-AIRPORT DR Off over Buck Owen Calloway Cnl?
It is owned by the State Highway Agency.