Arnold RD over Reservation Main Drain
FairImperial County, California · 0.6 MI W/O Picacho RD · Structure no. 58C0195
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Concrete Continuous
- Length
- 64 ft
- 2 main spans
- Daily traffic
- 1,000
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Arnold RD over Reservation Main Drain is a concrete continuous slab carrying Arnold RD over Reservation Main Drain in Imperial County, California. It was built in 1988, so it is 37 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 1,124 by 2043. The structure is 64 ft (19.5 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Arnold RD over Reservation Main Drain built?
It was built in 1988, making it 37 years old in 2025.
What condition is Arnold RD over Reservation Main Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Arnold RD over Reservation Main Drain carry?
About 1,000 vehicles per day (2021 count), of which roughly 2% are trucks.
How long is Arnold RD over Reservation Main Drain?
The structure is 64 ft (19.5 m) long with a longest span of 31 ft (9.4 m) and a deck 34 ft wide.
Who owns Arnold RD over Reservation Main Drain?
It is owned by the County Highway Agency.