W 2nd ST over New River
FairImperial County, California · 0.25 MI W/O SR 111 · Structure no. 58C0095
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected December 2023
- Type
- Slab
- Concrete Continuous
- Length
- 54 ft
- 2 main spans
- Daily traffic
- 2,500
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
W 2nd ST over New River is a concrete continuous slab carrying W 2nd ST over New River in Imperial County, California. It was built in 1973, so it is 52 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,500 vehicles a day, roughly 10% of them trucks, projected to reach 3,283 by 2042. The structure is 54 ft (16.5 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W 2nd ST over New River built?
It was built in 1973, making it 52 years old in 2025.
What condition is W 2nd ST over New River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does W 2nd ST over New River carry?
About 2,500 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is W 2nd ST over New River?
The structure is 54 ft (16.5 m) long with a longest span of 26 ft (7.9 m) and a deck 51 ft wide.
Who owns W 2nd ST over New River?
It is owned by the City or Municipal Highway Agency.