US Bridges

Evan Hewes Highway over East Highline Canal

Fair

Imperial County, California · 1 MI E/O SR-115 Exit I8 · Structure no. 58C0070

Built
1949
76 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
145 ft
3 main spans
Daily traffic
560
2020 count
Owner
County
County Highway Agency

About this bridge

Evan Hewes Highway over East Highline Canal is a steel stringer/multi-beam or girder carrying Evan Hewes Highway over East Highline Canal in Imperial County, California. It was built in 1949, so it is 76 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 560 vehicles a day, roughly 1% of them trucks, projected to reach 644 by 2042. The structure is 145 ft (44.2 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEvan Hewes Highway
CrossesEast Highline Canal
Location1 MI E/O SR-115 Exit I8
RouteCounty Highway 0
Coordinates32.7668, -115.2718
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.7 US tons
Inventory rating42.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length145 ft (44.2 m)
Longest span47 ft (14.3 m)
Deck width32 ft (9.9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic560 (2020)
Projected traffic644 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Evan Hewes Highway over East Highline Canal built?

It was built in 1949, making it 76 years old in 2025.

What condition is Evan Hewes Highway over East Highline Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Evan Hewes Highway over East Highline Canal carry?

About 560 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Evan Hewes Highway over East Highline Canal?

The structure is 145 ft (44.2 m) long with a longest span of 47 ft (14.3 m) and a deck 32 ft wide.

Who owns Evan Hewes Highway over East Highline Canal?

It is owned by the County Highway Agency.