Yourman RD over Central Main Canal
FairImperial County, California · 0.5 MI N/O of Cole RD · Structure no. 58C0036
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected December 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 84 ft
- 2 main spans
- Daily traffic
- 300
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Yourman RD over Central Main Canal is a concrete continuous tee beam carrying Yourman RD over Central Main Canal in Imperial County, California. It was built in 1965, so it is 60 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 300 vehicles a day, roughly 1% of them trucks, projected to reach 438 by 2042. The structure is 84 ft (25.6 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Yourman RD over Central Main Canal built?
It was built in 1965, making it 60 years old in 2025.
What condition is Yourman RD over Central Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Yourman RD over Central Main Canal carry?
About 300 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Yourman RD over Central Main Canal?
The structure is 84 ft (25.6 m) long with a longest span of 41 ft (12.5 m) and a deck 34 ft wide.
Who owns Yourman RD over Central Main Canal?
It is owned by the County Highway Agency.