US Bridges

Interstate 8 EB over Boulder Creek

Good

Imperial County, California · 11-IMP-008-R0.96R · Structure no. 58 0295R

Built
1964
61 years old
Condition
Good
inspected May 2024
Type
Tee Beam
Concrete Continuous
Length
82 ft
2 main spans
Daily traffic
5,423
2018 count
Owner
State
State Highway Agency

About this bridge

Interstate 8 EB over Boulder Creek is a concrete continuous tee beam carrying Interstate 8 EB over Boulder Creek in Imperial County, California. It was built in 1964, so it is 61 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,423 vehicles a day, roughly 20% of them trucks, projected to reach 10,270 by 2041. The structure is 82 ft (25 m) long and 42 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesInterstate 8 EB
CrossesBoulder Creek
Location11-IMP-008-R0.96R
RouteInterstate 8
Coordinates32.65654, -116.09705
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.7 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length82 ft (25 m)
Longest span40 ft (12.2 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,423 (2018)
Projected traffic10,270 by 2041
Trucks20%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Interstate 8 EB over Boulder Creek built?

It was built in 1964, making it 61 years old in 2025.

What condition is Interstate 8 EB over Boulder Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Interstate 8 EB over Boulder Creek carry?

About 5,423 vehicles per day (2018 count), of which roughly 20% are trucks.

How long is Interstate 8 EB over Boulder Creek?

The structure is 82 ft (25 m) long with a longest span of 40 ft (12.2 m) and a deck 42 ft wide.

Who owns Interstate 8 EB over Boulder Creek?

It is owned by the State Highway Agency.