US Bridges

No Data Entered over No Data Entered

Good

Humboldt County, California · No Data Entered · Structure no. 051053000001012

Built
1988
37 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
65 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over No Data Entered is a prestressed concrete stringer/multi-beam or girder carrying No Data Entered over No Data Entered in Humboldt County, California. It was built in 1988, so it is 37 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 65 ft (19.8 m) long and 16 ft wide.

CarriesNo Data Entered
CrossesNo Data Entered
LocationNo Data Entered
RouteFederal Lands Road 7N30
Coordinates41.00742, -123.60236
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40.3 US tons
Inventory rating26.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length65 ft (19.8 m)
Longest span65 ft (19.8 m)
Deck width16 ft (4.9 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over No Data Entered built?

It was built in 1988, making it 37 years old in 2025.

What condition is No Data Entered over No Data Entered in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does No Data Entered over No Data Entered carry?

About 50 vehicles per day (latest count).

How long is No Data Entered over No Data Entered?

The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 16 ft wide.

Who owns No Data Entered over No Data Entered?

It is owned by the U.S. Forest Service.