Albert Etter Ra RD over Bear Creek
FairHumboldt County, California · 0.2 MI Sw/O Etrsbg-Hnydw · Structure no. 04C0143
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 89 ft
- 1 main span
- Daily traffic
- 50
- 2011 count
- Owner
- County
- County Highway Agency
About this bridge
Albert Etter Ra RD over Bear Creek is a steel stringer/multi-beam or girder carrying Albert Etter Ra RD over Bear Creek in Humboldt County, California. It was built in 1985, so it is 40 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 65 by 2045. The structure is 89 ft (27.1 m) long and 9 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Albert Etter Ra RD over Bear Creek built?
It was built in 1985, making it 40 years old in 2025.
What condition is Albert Etter Ra RD over Bear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Albert Etter Ra RD over Bear Creek carry?
About 50 vehicles per day (2011 count).
How long is Albert Etter Ra RD over Bear Creek?
The structure is 89 ft (27.1 m) long with a longest span of 85 ft (25.9 m) and a deck 9 ft wide.
Who owns Albert Etter Ra RD over Bear Creek?
It is owned by the County Highway Agency.