Bair Road over Redwood Creek
FairHumboldt County, California · 3.4 MI N/O SR 299 · Structure no. 04C0116
- Built
- 1950
- 75 years old, rebuilt 1967
- Condition
- Fair
- inspected June 2023
- Type
- Truss - Thru
- Steel
- Length
- 144 ft
- 1 main span
- Daily traffic
- 113
- 2006 count
- Owner
- County
- County Highway Agency
About this bridge
Bair Road over Redwood Creek is a steel truss - thru carrying Bair Road over Redwood Creek in Humboldt County, California. It was built in 1950 and reconstructed in 1967, so it is 75 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 113 vehicles a day, roughly 1% of them trucks, projected to reach 437 by 2041. The structure is 144 ft (43.9 m) long and 23 ft wide. If it were closed, the detour would be 47.2 mi (76 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bair Road over Redwood Creek built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1967.
What condition is Bair Road over Redwood Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Bair Road over Redwood Creek carry?
About 113 vehicles per day (2006 count), of which roughly 1% are trucks.
How long is Bair Road over Redwood Creek?
The structure is 144 ft (43.9 m) long with a longest span of 100 ft (30.5 m) and a deck 23 ft wide.
Who owns Bair Road over Redwood Creek?
It is owned by the County Highway Agency.