US Bridges

County RD 200 over Salt Creek

Fair

Glenn County, California · 2.1 MI W of CO RD 306 · Structure no. 11C0124

Built
1955
70 years old
Condition
Fair
inspected August 2024
Type
Slab
Concrete Continuous
Length
57 ft
3 main spans
Daily traffic
100
2009 count
Owner
County
County Highway Agency

About this bridge

County RD 200 over Salt Creek is a concrete continuous slab carrying County RD 200 over Salt Creek in Glenn County, California. It was built in 1955, so it is 70 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 20% of them trucks, projected to reach 141 by 2044. The structure is 57 ft (17.4 m) long and 24 ft wide. If it were closed, the detour would be 34.2 mi (55 km).

CarriesCounty RD 200
CrossesSalt Creek
Location2.1 MI W of CO RD 306
RouteCounty Highway 0
Coordinates39.79939, -122.5592
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length57 ft (17.4 m)
Longest span19 ft (5.8 m)
Deck width24 ft (7.4 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2009)
Projected traffic141 by 2044
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed34.2 mi (55 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County RD 200 over Salt Creek built?

It was built in 1955, making it 70 years old in 2025.

What condition is County RD 200 over Salt Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does County RD 200 over Salt Creek carry?

About 100 vehicles per day (2009 count), of which roughly 20% are trucks.

How long is County RD 200 over Salt Creek?

The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 24 ft wide.

Who owns County RD 200 over Salt Creek?

It is owned by the County Highway Agency.