Road 9 over Central Irrigation Canal
FairGlenn County, California · Just W of Road 203 · Structure no. 11C0081
- Built
- 1941
- 84 years old, rebuilt 1990
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 100 ft
- 3 main spans
- Daily traffic
- 1,553
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Road 9 over Central Irrigation Canal is a steel stringer/multi-beam or girder carrying Road 9 over Central Irrigation Canal in Glenn County, California. It was built in 1941 and reconstructed in 1990, so it is 84 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,553 vehicles a day, roughly 25% of them trucks, projected to reach 1,776 by 2042. The structure is 100 ft (30.5 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Road 9 over Central Irrigation Canal built?
It was built in 1941, making it 84 years old in 2025. It was reconstructed in 1990.
What condition is Road 9 over Central Irrigation Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Road 9 over Central Irrigation Canal carry?
About 1,553 vehicles per day (2018 count), of which roughly 25% are trucks.
How long is Road 9 over Central Irrigation Canal?
The structure is 100 ft (30.5 m) long with a longest span of 40 ft (12.2 m) and a deck 30 ft wide.
Who owns Road 9 over Central Irrigation Canal?
It is owned by the County Highway Agency.