County RD 24 over Central Irrigation Canal
FairGlenn County, California · 0.3 MI West of SH 45 · Structure no. 11C0038
- Built
- 1948
- 77 years old
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Concrete Continuous
- Length
- 102 ft
- 4 main spans
- Daily traffic
- 634
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 24 over Central Irrigation Canal is a concrete continuous slab carrying County RD 24 over Central Irrigation Canal in Glenn County, California. It was built in 1948, so it is 77 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 634 vehicles a day, roughly 15% of them trucks, projected to reach 731 by 2044. The structure is 102 ft (31.1 m) long and 31 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 24 over Central Irrigation Canal built?
It was built in 1948, making it 77 years old in 2025.
What condition is County RD 24 over Central Irrigation Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does County RD 24 over Central Irrigation Canal carry?
About 634 vehicles per day (2018 count), of which roughly 15% are trucks.
How long is County RD 24 over Central Irrigation Canal?
The structure is 102 ft (31.1 m) long with a longest span of 30 ft (9.1 m) and a deck 31 ft wide.
Who owns County RD 24 over Central Irrigation Canal?
It is owned by the County Highway Agency.