US Bridges

Davis Ave over Future High Speed Rail

Good

Fresno County, California · 1.9 Miles West of SR 43 · Structure no. 42C0714

Built
2023
2 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
418 ft
3 main spans
Daily traffic
1,000
2023 count
Owner
State
Other State Agency

About this bridge

Davis Ave over Future High Speed Rail is a prestressed concrete box beam or girders - multiple carrying Davis Ave over Future High Speed Rail in Fresno County, California. It was built in 2023, so it is 2 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 3% of them trucks, projected to reach 1,300 by 2043. The structure is 418 ft (127.4 m) long and 35 ft wide.

CarriesDavis Ave
CrossesFuture High Speed Rail
Location1.9 Miles West of SR 43
RouteCounty Highway 0
Coordinates36.47421, -119.66981
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length418 ft (127.4 m)
Longest span188 ft (57.3 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2023)
Projected traffic1,300 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther State Agency
Maintained byOther State Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Davis Ave over Future High Speed Rail built?

It was built in 2023, making it 2 years old in 2025.

What condition is Davis Ave over Future High Speed Rail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Davis Ave over Future High Speed Rail carry?

About 1,000 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is Davis Ave over Future High Speed Rail?

The structure is 418 ft (127.4 m) long with a longest span of 188 ft (57.3 m) and a deck 35 ft wide.

Who owns Davis Ave over Future High Speed Rail?

It is owned by the Other State Agency.