US Bridges

S Madera Avenue over Stinson Canal

Fair

Fresno County, California · 0.5 MI S of Elkhorn Ave · Structure no. 42C0550

Built
1945
80 years old
Condition
Fair
inspected November 2023
Type
Slab
Concrete Continuous
Length
25 ft
2 main spans
Daily traffic
100
2010 count
Owner
County
County Highway Agency

About this bridge

S Madera Avenue over Stinson Canal is a concrete continuous slab carrying S Madera Avenue over Stinson Canal in Fresno County, California. It was built in 1945, so it is 80 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 213 by 2045. The structure is 25 ft (7.6 m) long and 24 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesS Madera Avenue
CrossesStinson Canal
Location0.5 MI S of Elkhorn Ave
RouteCounty Highway 0
Coordinates36.48068, -120.06723
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.3 US tons
Inventory rating26.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span12 ft (3.7 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2010)
Projected traffic213 by 2045
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S Madera Avenue over Stinson Canal built?

It was built in 1945, making it 80 years old in 2025.

What condition is S Madera Avenue over Stinson Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does S Madera Avenue over Stinson Canal carry?

About 100 vehicles per day (2010 count), of which roughly 10% are trucks.

How long is S Madera Avenue over Stinson Canal?

The structure is 25 ft (7.6 m) long with a longest span of 12 ft (3.7 m) and a deck 24 ft wide.

Who owns S Madera Avenue over Stinson Canal?

It is owned by the County Highway Agency.