S Willow Ave over Central Canal
FairFresno County, California · 0.17 MI N Jensen Ave · Structure no. 42C0521
- Built
- 1995
- 30 years old, rebuilt 2012
- Condition
- Fair
- inspected January 2025
- Type
- Slab
- Concrete
- Length
- 43 ft
- 1 main span
- Daily traffic
- 3,507
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S Willow Ave over Central Canal is a concrete slab carrying S Willow Ave over Central Canal in Fresno County, California. It was built in 1995 and reconstructed in 2012, so it is 30 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,507 vehicles a day, roughly 15% of them trucks, projected to reach 2,781 by 2047. The structure is 43 ft (13.2 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Willow Ave over Central Canal built?
It was built in 1995, making it 30 years old in 2025. It was reconstructed in 2012.
What condition is S Willow Ave over Central Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does S Willow Ave over Central Canal carry?
About 3,507 vehicles per day (2010 count), of which roughly 15% are trucks.
How long is S Willow Ave over Central Canal?
The structure is 43 ft (13.2 m) long with a longest span of 41 ft (12.5 m) and a deck 52 ft wide.
Who owns S Willow Ave over Central Canal?
It is owned by the City or Municipal Highway Agency.